June
2022
Canopy with Roller Shutters for Ysgol Glanrafon in Mold
Roller shutter doors and side panels were added to the canopy design at Ysgol Glanrafon to create a bespoke shelter which met all of their requirement...
Read ArticleRoller shutter doors and side panels were added to the canopy design at Ysgol Glanrafon to create a bespoke shelter which met all of their requirement...
Read ArticleGorsey Bank Primary School wanted to redevelop an area of their playground by adding a new shelter, they contacted canopy experts A&S Landscape for th...
Read ArticleAfter having a canopy installed by A&S Landscape previously, Ysgol Carreg Emlyn was keen to get us back on site to install another structure.
Read ArticleA&S Landscape was thrilled at the chance to work with the locally based Nelson Primary School in Birmingham. The aim was to create more outdoor covere...
Read ArticleGwalchmai Primary School were looking for a way to cover their outdoor playground so that the pupils could spend more time outside.
Read ArticleAs part of a series of improvements being made to Chantry Academy, A&S Landscape was asked to install two small shelters on the grounds.
Read ArticleFor this project, we were asked to install a straight roof entrance canopy to Valley Primary School in Holyhead.
Read ArticleA&S Landscape was asked to manufacture and install a straight roof canopy at Cardinal Newman High School in Luton. This would create more outdoor cove...
Read ArticleMusgrove Park Hospital in Taunton needed three matching covered walkways to shield patients and staff when arriving at the site and moving between the...
Read ArticleDavid Lloyd Brighton in the city of Brighton needed a gym shelter for its outdoor workout area. It wanted the model to be able to withstand bad weathe...
Read Project