Open Interactive Menu

Outdoor Waiting Shelter Christ Church CE Primary School Birmingham

Star Rating

Share Page

Twitter share icon Facebook share icon LinkedIn share icon

Print, download or email page

Email project button

Christ Church CE Primary School
  • Previous slide
  • Next slide
  • Product

    Motiva Mono

  • Size

    8000MM X 5000MM

  • Colours

    BLUE RAL5002

Project Details

The beauty of good design is it looks like it was always meant to be there.

When we installed this outdoor waiting shelter in the West Midlands (Birmingham) we were aware of the space we had to fit within. Christ Church C of E Primary School already had a designated area but really needed an outdoor canopy to keep parents dry when waiting for their children.

Enter the Motiva Mono, fitting in at 8000mm x 5000mm in striking Blue (RAL5002) steelwork, this new structure fits the bill so perfectly it could have been built the same day the school was.

And that’s what happens when you work closely with our design team. We can always work to support your needs and create designs that fit within the space you have. No job is standard and that’s why we provide a constantly outstanding service.

Read more about similar projects on our blog

Review

Dear Sirs

We were very impressed with the service we received from A&S Landscape from the design process through to completion. The work was completed to a high specification and during the summer holidays to there was no disruption to the school day. The parents can now wait for their children in the rain without getting wet which they are very pleased about. The canopies fit so well, they look like they have always been there rather than an add on. We'd be happy to recommend A&S Landscape to other schools having this type of work done

Headteacher Christ Church CE Primary School

Scroll down
Go Back